For interior & hospitality projects: FF&E delivered to spec, on the project timeline
Projects don't get second containers: the install date is the install date. We inspect against the FF&E schedule itself and keep production honest to the timeline, so procurement never explains a delayed opening.



How we protect project buyers
Spec-package inspection
Every line item checked against the FF&E schedule and finishes package.
Production monitoringTimeline monitoring
Production tracked against install dates—slippage flagged in week 2, not week 8.
Container loading supervisionMulti-vendor consolidation
Per-factory tally at loading when one container serves one project.
Tell us your product, supplier status and destination market — we'll recommend the right sequence of services and a fixed quote within 24 hours. Every engagement runs under our Independence Charter.
What to check on a project order
Project furniture is judged against a specification and an installation date. These are the checks that keep a multi-vendor order consistent and on site in time.
Spec checks
Dimensions, finish, hardware and labels checked line by line against the schedule.
EN standardsContract-grade strength
Contract seating and tables have their own EN standards. Name them, with the edition, in the specification.
DEF-049 · Defect libraryFinish across vendors
Pieces from several workshops drift in colour and size unless every batch is held to one sample.
Product guideLeather seating
Leather grade, hide marks and colour matching between hides, checked before the covers go on.
Product guideStone-top tables
Stone tops crack and chip; agree the stone, the base and the crate before production.
DEF-035 · Defect libraryTall storage
Units that tip with drawers open are a critical defect. Supply a wall fixing for tall pieces.